CGM BANDI
POR MARCHE FESR 2014-2020 - Asse 8 - OS 21 - Azione 21.1 - Intervento 21.1.1
PROJECT DESCRIPTION
POR MARCHE FESR 2014-2020 – Asse 8 – OS 21 – Azione 21.1 –
Intervento 21.1.1
OBJECTIVES
Construction of a new production facility, with a particular focus on areas dedicated to production lines and a refrigerated storage cell.
RESULTS
- Construction of a new production building completed.
Installation of a new cold storage cell for packaged product storage, eliminating the need for external warehouses. - Acquisition of new technologies (plants, machinery, and equipment) for the new unit (increased production capacity), enabling: Internalization of previously outsourced processes Significant reduction in processing times (automation) Strategic expansion of product range (new SKUs and references).
- Created the foundation for a stable increase in business volume and long-term consolidation and expansion of employment.
- Acquired specific know-how (through consulting) to align the project with Industry 4.0 standards.
FUNDING
Application ID: 16922
Approved investment: € 5.000.000,00
Approved contribution: € 1.039.000,00
Rione Pollenza Scalo 85 (MC)
Contatct Us
phone: +39 0733 201025
info@cgmsurgelati.it
Monday – Friday:
8am – 6pm
Saturday – Sunday:
Closed